1. Project: | Division: Engineering & Construction Client: IAMGOLD Date: April 2022 to date | |
2. Project : Cone Penetrometer with Pore Pressure | Division: Geoservices Client: NORDGOLD Date: March 2024 – April 2024 |
1. Project: Scoping Study, Pre-Feasibility Studies (PFS) and Front-End Engineering Design (FEED) Covering Ground Investigations, Design of Tailings Storage Facility (TSF) , Water Storage Dam (WSD), Process Plant, Access Roads and Other Mine Infrastructure.
2. Project: Ground (Geotechnical, Geophysical & Hydrogeological) Investigations for the Design of TSFs for AngloGold Ashanti Obuasi Mine.
3. Project: Installation of TSF Telemetry System.
4. Project: Drilling and Installation of Multi-channel Vibratory Wire Piezometers (VWPs) for an Open Pit Mining Operation.
5. Project: Greater Accra Resilience & Integrated Development (GARID) Project: Geotechnical Site Investigations, Geophysical Studies (SRT & MASW) and Material Testing.
6. Project: Installation of TSF Monitoring Instruments (VWPs & Inclinometers).
1. Project : Vibrating Wire Piezometers(VWPs) Installations on a Tailings Storage Facility (TSF) and Decommissioning of Existing Standpipe Piezometers (SPs).
2. Project: Concrete and Plate Load Testing (PLT) per Design Specifications for the Construction of a New Gold Mine.
1. Project: Resident Tailings Facility Engineer (RTFE) Services for AngloGold Ashanti Siguiri Mine.
2. Project : SMD TSF 2 Stage 1 – EPCM for the Construction of a New TSF.
1. Project : Zanaga Iron Ore project – Quality Control, Geotechnical Drilling Supervision & Material Testing.
1. Project : Dugbe Gold Project – Greenfields Exploration Drilling & Reporting.